Metal Plating

LES provided a 10 gpm mobile heavy metal recovery unit to process electroless nickel plating waste solution.  45 drums of concentrated nickel waste were treated on-site with pH adjustment and carbon adsorption.  LES supplied the two (2) 1,000 gallon treatment tanks, feed system and two (2) 300 pound carbon adsorbers.  The effluent from the carbon system was less than 1.0 mg/l and legally discharged to the sewer.